Iraq’s future tied to deadlocked TotalEnergies deal
The $27bn megaproject is key to Iraq’s 2027 oil and gas production goals
The fate of Iraq’s crude and gas production is tied to a stalled $27bn deal with France's TotalEnergies. Almost 18 months after the set of major energy projects was awarded to the French major and a new government was formed, the political limbo remains. The importance of the deal to Iraq’s hydrocarbons sector cannot be underestimated, with the Gas Growth Integrated Project (GGIP) forecast to account for just under 20pc of Iraq’s gas production by 2027 and a seawater injection facility being pivotal to the country’s target of raising oil output from 4.5mn bl/d currently to 7mn bl/d by 2027. c.20pc – GGIP’s projected share of Iraq’s gas production by 2027 Opec’s second-largest produce
Also in this section
27 February 2026
LNG would serve as a backup supply source as domestic gas declines and the country’s energy system comes under stress during periods of low hydropower output and high energy demand
27 February 2026
The assumption that oil markets will re-route and work around sanctions is being tested, and it is the physical infrastructure that is acting as the constraint
27 February 2026
The 25th WPC Energy Congress to take place in tandem as part of a coordinated week of high-level ministerial, institutional and industry engagements
27 February 2026
The deepwater sector must be brave by fast-tracking projects and making progress to seize huge offshore opportunities and not become bogged down by capacity constraints and consolidation






