Related Articles
Forward article link
Share PDF with colleagues

Cyprus eyes natural gas era

LNG imports are a first step. Exports and bunkering may come next

Cyprus is a rare bright spot for LNG trade amid the demand destruction and project delays that the Covid-19 pandemic has wrought in the industry. Construction started in July on the EU-funded Cynergy floating storage and regasification unit (FSRU) and LNG terminal project, which will bring first gas, energy diversification, greater supply security and reduced carbon emissions to the island from 2022. The country, currently almost completely isolated from EU energy links, sits on top of at least 13tn ft³ of offshore gas, including the 4.5tn ft³ (370bn m3) Aphrodite field in block 12, the 3-5tn ft³ Calypso in block 6 and, most recently in February 2019, the 5-8tn ft³ Glaucus in block 10. Para

Comments

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}
Also in this section
European refiner hopes for a driving season
26 February 2021
Varo sees the potential for a desire to holiday but a reluctance to fly recreating the US phenomenon on the other side of the Atlantic
LNG central to Asian net-zero emissions strategies—Shell
26 February 2021
Major consuming countries’ net-zero emissions targets will drive rather than hinder growth, with trade set to double by 2040
Asian LNG demand poised to climb further
26 February 2021
The LNG sector remains very bullish about the prospects for Asian demand in the 2020s
Sign Up For Our Newsletter
Project Data
Maps
PE Store
Social Links
Social Feeds
Featured Video