Decision time for US Keystone XL pipeline
President Obama must make a decision on the TransCanada proposed pipeline
After six years of debate, hopes are rising for a go-ahead decision for a pipeline which will flow Canadian heavy crude direct to refineries on the US Gulf Coast. Although the president, Barack Obama, opposes the project on environmental grounds, the weight of industry and political lobbying could force his hand. The $8 billion Keystone XL pipeline, which TransCanada Corporation wants to build, will be a 36-inch line extending 1,897 km from Hardisty in Alberta, Canada, to Steele City in Nebraska, US. At Steele City it will connect with an existing TransCanada pipeline running to the refineries at Port Arthur, Texas - and an extension due to be completed this year will take crude to the refin
Also in this section
23 April 2026
The addition of an oil pipeline to the Power of Siberia 2 gas project could ensure deliveries of Russian oil to China, materially shorten logistics lines between West Siberia and final customers, and—amid disruption in the Strait of Hormuz—offer a land-based export route that reduces exposure to maritime chokepoints
23 April 2026
There is a clear push to bolster exports to Asia amid uncertainty around its North American neighbour, but there are limits to the benefits from the energy crisis
23 April 2026
Shell made the play-opening discovery in Namibia’s Orange basin back in 2022, but its next well could decide whether the project can actually be commercialised
22 April 2026
The failure of OMV Petrom’s keenly watched exploration campaign at Bulgaria’s Han Asparuh block highlights the Black Sea’s uneven track record, despite major successes like Neptun Deep and Sakarya






