1 March 2010
Hungary: South Stream company gives pipeline much needed impetus
Yet although the agreement gives the pipeline project much-needed impetus, it remains doubtful when – or if – it will be completed. South Stream Hungary, which will be jointly owned by Russia's state-controlled Gazprom and the Hungarian Development Bank, is authorised to commission a feasibility study, raise financing, build and operate the section of the pipeline that will traverse Hungarian soil en route to Austria. Pavel Oderov, chief co-ordinator of the Gazprom-led project, was quoted in the Hungarian press as saying that talks with banks to secure financing will begin soon. "The pipeline will be finished and become operational by 2015, and we firmly trust we can keep to the planned sch
Also in this section
23 April 2026
The addition of an oil pipeline to the Power of Siberia 2 gas project could ensure deliveries of Russian oil to China, materially shorten logistics lines between West Siberia and final customers, and—amid disruption in the Strait of Hormuz—offer a land-based export route that reduces exposure to maritime chokepoints
23 April 2026
There is a clear push to bolster exports to Asia amid uncertainty around its North American neighbour, but there are limits to the benefits from the energy crisis
23 April 2026
Shell made the play-opening discovery in Namibia’s Orange basin back in 2022, but its next well could decide whether the project can actually be commercialised
22 April 2026
The failure of OMV Petrom’s keenly watched exploration campaign at Bulgaria’s Han Asparuh block highlights the Black Sea’s uneven track record, despite major successes like Neptun Deep and Sakarya






