Blastr plans €4bn Finnish green steel plant
Norwegian startup aims to begin production by 2026
Norwegian startup Blastr has announced plans to build a €4bn ($4.24bn) green steel and integrated hydrogen production facility in Finland. Blastr plans to replace coke and coal with hydrogen in the chemical reduction phase, in addition to reducing emissions throughout the value chain, with a target of 95pc lower CO₂ emissions compared with conventional steel manufacturing. The firm plans to produce 2.5mn t/yr of hot- and cold-rolled green steel at the plant, with first production in 2026. The firm has signed a letter of intent with energy company Fortum providing exclusive rights to utilise an existing industrial site near the port of Inkoo. “Inkoo was selected as our location due to its hig
Also in this section
4 February 2026
Europe’s largest electrolyser manufacturers are losing patience with policymakers as sluggish growth in the green hydrogen sector undermines their decision to expand production capacity
2 February 2026
As a fertiliser feedstock, it is indispensable, but ammonia’s potential as a carbon-free energy carrier is also making it central to global decarbonisation strategies
28 January 2026
The development of hydrogen’s distribution system must speed up if the industry is to stand any chance of grabbing a meaningful slice of the low-carbon energy market
14 January 2026
Continent’s governments must seize the green hydrogen opportunity by refining policies and ramping up the development of supply chains and infrastructure






