Blastr plans €4bn Finnish green steel plant
Norwegian startup aims to begin production by 2026
Norwegian startup Blastr has announced plans to build a €4bn ($4.24bn) green steel and integrated hydrogen production facility in Finland. Blastr plans to replace coke and coal with hydrogen in the chemical reduction phase, in addition to reducing emissions throughout the value chain, with a target of 95pc lower CO₂ emissions compared with conventional steel manufacturing. The firm plans to produce 2.5mn t/yr of hot- and cold-rolled green steel at the plant, with first production in 2026. The firm has signed a letter of intent with energy company Fortum providing exclusive rights to utilise an existing industrial site near the port of Inkoo. “Inkoo was selected as our location due to its hig

Also in this section
20 August 2025
Woodside Energy among backers of Australian firm’s Hydrilyte separation and storage technology
13 August 2025
If technology demand is a leading indicator, the industry’s recent downturn has further to go
12 August 2025
Norwegian renewables firm secures site for 400MW project, despite strategic shift away from green hydrogen
7 August 2025
Draft law opens door to large-scale carbon capture and storage, and could unleash investment in gas-based hydrogen projects