Related Articles
ITM plans to build a second factory in Sheffield, UK
Forward article link
Share PDF with colleagues

ITM Power acquires site for second factory

Firm intends to build a factory on the site capable of producing 1.5 GW/yr of electrolysers that it hopes to be fully operational by the end of 2023

UK electrolyser manufacturer ITM Power has acquired a site for its second factory in Tinsley, Sheffield. ITM intends to build a factory on the site capable of producing 1.5GW/yr of electrolysers that it hopes to be fully operational by the end of 2023. The site will be in addition to ITM’s 1GW/yr facility at nearby Bessemer Park, completed in January. The overall cost of the new Sheffield factory is expected to be £50-55mn ($68-74mn). In addition to the £13.4mn cost of the land, the company is allocating up to £16mn for the construction of the shell and £20-25mn for the equipment and power supply. Last month, the firm raised £250mn in equity financing to support the expansion of its manu

Comments

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}
Also in this section
Schott receives €5mn for hydrogen technologies
26 November 2021
German glass manufacturer is looking at ways to replace natural gas with hydrogen in the heating of furnaces
Germany doubles hydrogen goal
26 November 2021
Incoming coalition ramps up target for electrolyser capacity and gives priority to green hydrogen coupled with offshore wind
UK can be hydrogen leader – Johnson Matthey
26 November 2021
As an early adopter, nation can create a new supply chain and workforce across the country as it looks to capitalise on growing sector, says firm
Sign Up For Our Newsletter
Project Data
Maps
PE Store
Social Links
Social Feeds
Featured Video