ITM Power acquires site for second factory
Firm intends to build a factory on the site capable of producing 1.5 GW/yr of electrolysers that it hopes to be fully operational by the end of 2023
UK electrolyser manufacturer ITM Power has acquired a site for its second factory in Tinsley, Sheffield. ITM intends to build a factory on the site capable of producing 1.5GW/yr of electrolysers that it hopes to be fully operational by the end of 2023. The site will be in addition to ITM’s 1GW/yr facility at nearby Bessemer Park, completed in January. The overall cost of the new Sheffield factory is expected to be £50-55mn ($68-74mn). In addition to the £13.4mn cost of the land, the company is allocating up to £16mn for the construction of the shell and £20-25mn for the equipment and power supply. Last month, the firm raised £250mn in equity financing to support the expansion of its manufact

Also in this section
16 May 2025
Only 21% of approved IPCEI projects reach FID as cost overruns and funding delays hamper progress, according to European Commission officials
14 May 2025
Defining moment for US hydrogen sector as House Republicans seek termination of green tax credits
13 May 2025
Existing specifications have been a good starting point for standardisation of hydrogen quality, but they need rethinking—a 99.5 mol-% specification is a promising candidate
12 May 2025
The sector needs a standard covering hydrogen quality for the entire value chain, but no single hydrogen quality covers the needs of all stakeholders