Outlooks diverge for German LNG projects
RWE remains bullish on Brunsbuettel while Uniper rethinks Wilhelmshaven
German utility RWE, which is signed up to take a “significant part of the capacity” of the proposed 5bn m³/yr LNG import facility in northwest Germany, remains confident of progress on the plant. But its peer Uniper is going back to the drawing board with a similar plan for a 10bn m³/yr project further along the country’s northwestern coast. “I can confirm that we expect the EPC contracts to be submitted by year-end,” says Markus Krebber, RWE’s CFO, while cautioning that the firm is not either the current or future operator of the planned facility. The Brunsbuettel terminal is bring advanced by a consortium of German logistics firm Oiltanking and Dutch infrastructure companies Vopak and Gasu
Also in this section
23 April 2026
The addition of an oil pipeline to the Power of Siberia 2 gas project could ensure deliveries of Russian oil to China, materially shorten logistics lines between West Siberia and final customers, and—amid disruption in the Strait of Hormuz—offer a land-based export route that reduces exposure to maritime chokepoints
23 April 2026
There is a clear push to bolster exports to Asia amid uncertainty around its North American neighbour, but there are limits to the benefits from the energy crisis
23 April 2026
Shell made the play-opening discovery in Namibia’s Orange basin back in 2022, but its next well could decide whether the project can actually be commercialised
22 April 2026
The failure of OMV Petrom’s keenly watched exploration campaign at Bulgaria’s Han Asparuh block highlights the Black Sea’s uneven track record, despite major successes like Neptun Deep and Sakarya






