Philippine LNG sector picks up speed
As much as 10.5mn t/yr of regasification capacity could be coming online in 2022
The Philippines is seeking to build the necessary infrastructure to increase gas-fired power generation even as its domestic gas production declines. Two LNG regasification projects have reached development milestones recently, while three others are in development. And at least one consortium is looking at a potential sixth terminal. The Philippine Department of Energy granted the Atlantic Gulf & Pacific Company of Manila (AG&P)—which is part owned by Japan’s Osaka Gas and the Japan Bank for International Cooperation—notice to proceed in early March with its import and regasification terminal at Batangas Bay in Luzon. The project, known as Philippines LNG, or PLNG, is due to be comm

Also in this section
14 March 2025
Gas production slumped to an eight-year low in 2024, but new discoveries and partnership with Cyprus paint a more positive outlook
13 March 2025
Gas will become a more important part of the energy mix longer-term, raising the alarm for much-need investment as supply struggles to keep up with demand
13 March 2025
The spectre of Saudi Arabia’s 2020 market share strategy haunts a suffering OPEC+ as Trump upends the energy world
12 March 2025
Petronas-Eni eyes joint venture to prioritise key gas developments, with huge opportunities for growth in Indonesia and a steady Malaysia portfolio